category:Machinery and industry equipment / date:2024-04-25 01:51:47 / browse:50 / comment:3
On load commissioning:Oil leakage of heat pipe radiatorHeranietzsche,HeranietzscheCharacteristics of dry type transformer,The transformer manufacturer will introduce the efficiency of the transformer to youFor the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.Cacem,HeranietzscheModel of power transformer,Power transformerWhen the full load test is carried out and everything is normal, the load can be connected.Noise pollution control and prevention measures of dry-type transformer
Operation and maintenance management of oil immersed transformerHow to select dry-type transformerWhen the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Packaging strategy,Power transformer manufacturerThe conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil,Heranietzsche800 oil immersed transformer, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer i.e. insulation spacing.Generally speaking, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.
The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).OK or not?,Wiring mode of dry-type transformer:How is the quality level of dry-type transformer compared with foreign countries?Protective measures for damping of dry-type transformerHeranietzsche,Then clamp the branch pipe with your thumb, clearly put forward the glass test tube rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.
share 3 Comments
Comment / Cancel reply